Part 4b: Testing the Stellaris model against ARIES

Supports the main post. Part 4a describes how the Stellaris model was built. Part 3, the full harness, explains goals and rounds.

1The hypothesis and the test

Our larger goal was to assess whether an AI-assisted modeling process could help us develop and evaluate engineering concepts. The hypothesis was that we could start from one documented stellarator design, abstract it into a generalized system model, and use that model to explore alternatives.

Think of the model as a library of component definitions and a plant assembled from them. A definition describes a component's behavior and limits. A plant selects components, connects them and supplies their input values. "Generalized" means the relationships live in the definitions and the choices live in the plant. We can then change dimensions and operating conditions, select different components or materials, and change how the plant is assembled: the three kinds of design-space exploration the modeling strategy is intended to support.

The challenge is assessing whether those abstractions are realistic and coherent. A program can execute correctly and produce plausible numbers while describing the wrong physical system. Reproducing the design used to build the model is useful, but it does not tell us how well the model applies elsewhere.

We used a hold-out test: develop the model using one design, then assess it against a documented design we had deliberately withheld. We built the model from Stellaris and withheld ARIES-CS, a US design study of a compact stellarator power plant that published its physics, engineering and costs in detail. Agents were barred from reading the ARIES papers, and the research tooling refuses to register them (Part 3, section 3).

The test asked two questions:

Built from Stellaris, tested against ARIES-CS
Each question, and the sections that answer it in order
  • Question 1 · reproduce the withheld design

    Can the model reproduce ARIES? First with the existing library alone, changing only the plant's assembly, connections and inputs. If that fell short, we would add what ARIES needed, check that the additions worked with the existing components without changing the Stellaris model, and compare the result with ARIES's published power and cost.

    1. 3.1The existing library alone
    2. 3.2Adding what ARIES needed
    3. 3.3Comparing with ARIES's published power and cost
    4. 3.4The answer
  • Question 2 · explore beyond both plants

    Can the combined model explore designs neither plant covers? With both plants' components in one library, we would run one study for each kind of design change: an operating parameter, a component choice and the connections between components.

    1. 4.1An operating parameter: compressor pressure
    2. 4.2A component choice: steam or helium Brayton
    3. 4.3Connections: series or split exchangers
    4. 4.4The answer
Figure 1The test's two questions.

Each card in Figure 1 holds one question. Under it are the steps or studies that answer it, each linked to its section, and each question ends with its answer.

The endpoint was an explained assessment: what the model could calculate, how its results compared with the publication, which differences or missing capabilities remained, and what the combined model taught us about design choices.

2One false start before the main assessment

Our first ARIES run stopped before producing any result: a calculation that sized the magnet winding received a field outside the conductor model's range. Investigating it exposed a bigger problem. Several calculations sized equipment to meet calculated demand, including the magnet winding, facilities and fuel processing, instead of evaluating the equipment a designer had chosen. That breaks the design pattern the model is meant to follow (Part 4a, theme 4), and none of our checks had caught it.

Figure 2 contrasts the two patterns. Read the top row, what those calculations did, and then the bottom row, the pattern the model is meant to follow.

Sizing
what those calculations did
Calculated demand

what the plant needs at this design point

Equipment sized to match

the model chooses how big it is

Cost

of the equipment the model chose

The designer's choice is gone: the model has decided which parameters are free and which are derived.

Evaluation
the design pattern
Supplied equipment

the designer's choice, an input

Calculated demand

what the plant needs

Capacity check

fails when the supplied equipment is too small; nothing is enlarged

Cost

of the equipment the designer supplied

The repair moved the magnet winding, facilities and fuel processing, among others, to this pattern.

Figure 2Sizing equipment to demand, against evaluating equipment a designer supplies.

By then the agents had read all four ARIES papers, so the test could no longer be blind. We call that moment, when the withheld papers were opened, the reveal. We went back to the last code from before the reveal, strengthened the harness instructions, and ran a repair goal that turned those sizing calculations into supplied equipment with capacity checks. We recorded the exposure and kept ARIES-specific numbers out of the repair. Everything that follows is a comparison made after seeing the reference.

Evidence: false start and repair basis .project/active/aries-comparison-preparation/current-readiness/revealed-results/post-reveal-repair-results-note.md, completed design-pattern repairs work/orchestration/goals/preserve-model-design-choices/answer.md.

In the recordThe false start and the repair

The first run, 20 September 2026. The agent supplied three ARIES inputs, held the rest and made one forward run. It stopped when the calculated peak field fell outside the conductor approximation's 20–32 T range; the automatic winding-sizing calculation used that approximation and raised the error. The run returned no power, cost, LCOE or engineering-check results, and all 276 comparison rows stayed unavailable.

The owner's words on the problem it exposed: "As soon as you start introducing ‘sizing’, then you are basically pre-defining which design parameters are ‘free’ and which are ‘derived’. this is explicitly what we wanted to avoid."

The repair baseline. The verified checkpoint immediately before the reveal, commit 86712a0d. The results note records that returning to earlier code does not restore an unexposed hold-out, and that the repair task itself was chosen after the reveal.

What the repair goal changed (closed by the owner on 20 September):

  • Supplied magnet geometry, inventory and masses, facility geometry and allocations, fuel-processor throughput and cooling purchases now survive evaluation instead of being recalculated from demand.
  • Equipment prices follow the chosen purchase, and operating demand no longer selects the purchase amount.
  • Thermal requirements are checked against supplied ratings: 33 capacity checks were added, for 67 in all.

The repaired Stellaris design still fails six engineering screens, among them breeding, conductor current and winding fit. Passing verification means the calculations and their verdicts agree, not that the plant is adequate.

3Question 1: can the model reproduce ARIES?

We answered this in two steps: the existing library alone, then the library after adding what ARIES needed, which we compared with ARIES's published power and cost.

3.1With the existing library

We first tried the existing library alone. Any change to the plant's assembly, connections and inputs was allowed, but no new or changed component definitions. We ran it once, on the repaired model. The run supplied the ARIES values that matched a model input directly: major radius, minor radius and peak ion temperature. The other 701 inputs stayed at the Stellaris design. That included the magnets' turns and current per turn, because the ARIES papers give total ampere-turns, which fix neither choice.

The run stopped at the conductor calculation. The model calculated the field of the Stellaris coils, with their turns and current, at ARIES's smaller major radius: 14.7 tesla on axis, where ARIES has 5.7, and 56.6 tesla at the coils. The conductor model covers 20 to 32 tesla, the limit Part 4a ends on, so it refused to calculate. We obtained no plant assessment and no LCOE, the lifecycle cost per unit of electricity.

Figure 3 puts both designs' fields on one axis, on the plasma axis above and at the coils below. Black squares are ARIES's published values and blue circles are our run. The shaded band is the range the conductor model covers. Our run's field at the coils lies far above that range. ARIES's own coil field lies below it, and the range belongs to a different conductor from the one ARIES uses.

image/svg+xml 0 10 20 30 40 50 60 Magnetic field (tesla) conductor model's range, 20–32 T On the plasma axis At the coils ARIES 5.7 our run 14.7 ARIES 15.1 our run 56.6
Figure 3The magnetic field on the plasma axis and at the coils, for ARIES as published and for our run of the Stellaris coils at ARIES's major radius, against the conductor model's range. Data: .project/active/aries-comparison-preparation/post-reveal-investigation/field-audit/receipt.json and .project/active/aries-comparison-preparation/post-reveal-investigation/findings.md (F-003).

That failure came from running ARIES with the Stellaris coils, so on its own it does not show the library is at fault. With ARIES's own coils and connections, the existing components might still have worked. So we compared each part of the ARIES design with the library directly, and found three gaps that no choice of inputs or connections could close:

  • Magnetic field: the field calculation was calibrated at one coil geometry and leaves out a term that changes with geometry, so it cannot carry over to ARIES's coils. ARIES reports about 15.1 tesla at the coils.
  • Conductor performance: ARIES uses Nb3Sn conductor at about 4 K. The library had only a REBCO model at 20 K.
  • Heat removal and conversion: ARIES removes heat through separate helium and liquid-metal PbLi circuits and converts it in a helium Brayton cycle. Our plant had one helium circuit, a molten-salt intermediate loop and a steam cycle.

The existing library could not describe ARIES, because it lacked the definitions ARIES needs. Rewiring was allowed, but it could not supply the missing relationships.

Evidence: attempt and supplied inputs .project/active/aries-comparison-preparation/post-reveal-results/post-reveal-v1/report.md, field investigation .project/active/aries-comparison-preparation/post-reveal-investigation/findings.md, structural and numerical assessment .project/active/aries-comparison-preparation/final-assessment/report.md.

In the recordThe run, its inputs and where 56.6 tesla comes from

Supplied from ARIES: major radius 7.75 m, minor radius 1.70 m and peak ion temperature 11.83 keV. Held at the repaired Stellaris design: the other 701 inputs, including 308 turns per reference coil at 50,000 A per turn, the coil geometry, the conductor, equipment capacities, prices and finance.

What the run returned. The REBCO conductor-current calculation refused a peak field of 56.6 T at 20 K, outside its 20–32 T range. The run returned no outputs; all 67 engineering checks stayed unevaluated and LCOE was unavailable. There was one run and no retry with changed inputs.

How the field arises. The investigation reconstructed the arithmetic, and an independent review reproduced it:

StepValue
Field on axis: 48 coils of 15.4 million ampere-turns at a major radius of 7.75 m14.75 T
Radius of the coil centres: the 1.70 m plasma minor radius plus the held layers between plasma and coil3.55 m
Clearance inside the coils: 7.75 m less 3.55 m4.20 m
Peak-to-axis field ratio, calibrated at Stellaris2.77
Bore correction for the new geometry1.39
Peak field at the coils: 14.75 × 2.77 × 1.3956.6 T

Why it does not carry over. The peak-field approximation keeps one calibrated ratio and a bore correction. The equation it comes from also has a winding-pack term that changes with geometry, which the implementation leaves out because its coefficients were not available. A calibration at one geometry cannot say how that term changes at another, so the audit found a gap in scientific support, not a coding error.

In the recordThe comparison with ARIES, part by part

The assessment used the stopped run and changed no input, equation or range. It scored the model against the comparison's original criteria:

CriterionResult
Recognizable subsystems, with no first-order omissionFail. The broad plant functions are present, but ARIES's separate PbLi blanket heat-removal branch is absent.
Radial layers in the same orderPass, qualitatively: plasma, clearance, first wall, blanket, shield, vessel and coil. Layer thicknesses are not validated.
Cost-account coverageUnresolved. Vacuum, manifolds, cryostat and indirect-cost allocations cannot all be reconciled.
Derived quantities within a factor of threeNot established. The quantities lack matching definitions or independent prediction status.
Component costs within a factor of twoNot established. Twenty-one raw price pairs exist, but their dollar year, scope or technology is unresolved.
OverallDoes not pass. The structural failure is established; numerical accuracy is not.

3.2Adding what ARIES needed

Next we allowed new definitions. New physics was expected: we had modeled a steam cycle, not a helium Brayton cycle. The question was whether the new components would connect to the existing ones and reuse their relationships, without changing the Stellaris model.

Design choiceAdded for ARIESHow it connected to the existing library
Plasma densityA hollow density profile and its integration over the plasmaUses the existing reaction mathematics; its fusion power feeds the existing fuel balance
Blanket and coolantsRegion and material inventories; separate helium and PbLi heat accountsExisting capacity checks apply to each circuit's heat
Power conversionHelium Brayton components: compressors, intercoolers, turbine and recuperatorA second way to convert heat to power; it needed new connections and is not a drop-in replacement for steam
Equipment and costsSelected capacities, operating demands and purchasesExisting adequacy checks and lifecycle cost calculations use the new plant's results

A hollow density profile has a lower density at the plasma's center than partway out. ARIES's published profile has that dip at the center and keeps a finite density at the edge. The Stellaris model's density peaks at the center and falls to zero at the edge (Part 3, section 6), so no choice of its inputs gives ARIES's shape.

The plasma-to-fuel connection is the clearest example of reuse. The new plasma calculation produced fusion power, and the existing fuel model used that power to calculate fuel demand. Raising the density by 50% increased fusion power from about 1.84 to 4.13 GW and exceeded the selected exhaust-processing capacity. The existing check caught that failure, with no ARIES-specific fuel equation and no automatic enlargement of the equipment.

Figure 4 follows that connection from left to right. The first two boxes are calculations added for ARIES, the third is the existing fuel model and the last is its existing capacity check. Each box gives its value at the design density and with 50% more.

Added for ARIES
Hollow density profile

The plasma's density across its radius, from a supplied amplitude

Design density
× 1.0
50% more density
× 1.5
Added for ARIES
Plasma integration

Fusion power, using the existing reaction mathematics

Design density
1,835 MW
50% more density
4,130 MW
Existing library
Fuel model

Exhaust demand, in 10²² tritium atoms per second

Design density
1.24
50% more density
2.79
Existing check
Exhaust-processing capacity

Supplied: 2.0 × 10²² atoms per second, held fixed

Design density
passes
50% more density
fails

No fuel equation was written for ARIES, and the supplied capacity is not enlarged when demand rises.

Figure 4New plasma calculations feeding the existing fuel model and capacity check. Values from the connected plasma-to-fuel case in work/orchestration/aries-transfer-experiment/report.md.

The Stellaris model was unchanged: after the additions it still reproduced all 1,352 of its numeric outputs exactly.

Evidence: component additions, reuse and executed cases work/orchestration/aries-transfer-experiment/report.md, plant integration work/orchestration/goals/aries-integrated-heat-electricity/answer.md, equipment and cost integration work/orchestration/goals/aries-integrated-equipment-costs/answer.md.

In the recordThe eight additions and their tests

The additions were built as eight increments, each independently reviewed within its stated scope. Together they added 16 generic calculation definitions. They were checked case by case, not as a full plant.

IncrementWhat it calculatesExecuted evidence
Density profileA hollow density with a finite edge, from supplied choices13 supported cases, 25 refusals
Fuel reuseThe existing fuel definitions applied to ARIES cases, unchanged5 cases, 35 exact comparisons with the baseline
Plasma integrationFusion power, pressure and stored energy from the profiles14 supported cases, 25 refusals
ConstituentsRegion and material volumes, masses and price subtotals5 cases, 230 comparisons, 14 refusals
Plasma to fuelCalculated fusion power reaching fuel demand and capacity checks6 cases, 35 exact fuel comparisons
Blanket heatSeparate helium and PbLi heat, 1,192 and 1,444 MW in the source case7 cases, 42 heat comparisons, 11 refusals
Brayton cycleThree compressors with intercooling, recuperation and expansion9 cases, 306 comparisons, 21 refusals
Source budgetsARIES's published cost accounts feeding a cost per unit of energy8 cases, 112 comparisons, 20 refusals

A refusal is a case the calculation declines because it falls outside its supported range, recorded rather than approximated.

In the recordThe integrated ARIES plant

One assembly (models/designs/aries_cs_integrated/plant.sysml) connects the plasma to fuel demand, heat deposition, the helium, PbLi and divertor circuits, fixed-capability heat exchangers, a recuperated Brayton cycle, the generator and auxiliaries, and net electricity.

  • Calculated nominal case: 1,835 MW of fusion power, 2,240 MW of heat accepted, 423 MW net, with every scoped check satisfied. It is an assumed scenario, not a reconstruction of the published plant.
  • Equipment and costs: inventories, exchanger areas, pump capacities and machine ratings are inputs, independent of calculated demand. Overnight capital is $4.35 billion in 2004 dollars, and the annual operating cost is $3.2 billion when all tritium is bought at an assumed $30 million per kilogram.
  • Stellaris unchanged: an isolated replay reproduced all 1,352 numeric outputs and 68 responses exactly.

Magnets and conductor, breeding, heat deposition, hydraulics, materials and machine maps remain scientifically unqualified, and every output carries that flag.

3.3How close the extended model came

After the additions above, we evaluated the model against ARIES's published power balance and costs. We used explicit assumptions for unfinished physics, including magnet qualification and breeding. The purpose was to find what explained agreement or disagreement, not to keep adding detail until the totals matched.

Qualifying the magnets would mean calculating ARIES's field from its coils and checking its conductor at that field. The library still has neither calculation for ARIES (section 3.1), so the ARIES plant takes its magnets as selected inventories and costs from ARIES's own accounts.

Figure 5 has three panels. The top left compares net electricity from the same fusion power, with each plant's turbine inlet temperature on its bar. The top right compares cost of electricity with our model buying all its tritium, split into purchased tritium and everything else. The bottom panel applies ARIES's tritium assumption and accounting conventions to our model and plots the result at each discount rate from 0 to 10%, against ARIES's published figure.

image/svg+xml 0 250 500 750 1,000 1,250 Net electricity (MW) Our model ARIES, published 891 MW 1,000 MW turbine inlet 628 °C turbine inlet 708 °C Power from 2,436 MW of fusion 0 250 500 750 1,000 2004 $ per MWh Our model ARIES, published purchased tritium $627 + everything else $58 = $686 in all $77.6 Cost of electricity, our model buying all its tritium 0% 3% 5% 8% 10% Real discount rate 0 25 50 75 100 125 2004 $ per MWh $32 $46 $59 $85 $105 ARIES, published: $77.6 historical ARIES costing uses 4.35% Our model with ARIES's tritium assumption and accounting conventions
Figure 5Our 891 MW case against ARIES's published power and cost, in 2004 dollars. Data: exploration/aries_integrated/studies/20260925-aries-reconciled-alternative-economics/results/attribution.json and that study's cases.json.
  • Power: an unresolved gap. Given ARIES's 2,436 MW of fusion power, our best tested steady alternative produced 891 MW net against the published 1,000 MW. Power-balance assessment work/orchestration/goals/aries-reference-heat-electricity-reconciliation/answer.md
    • Beyond using the published inputs, removing all the heat took two changes. We corrected an error in our ARIES model, which had connected the cycle's three heat exchangers in series where ARIES splits the flow between two of them. And we raised the cycle flow and compressor rating above what the sources state.
    • The higher flow carries the same heat in more helium, so the turbine inlet reached 628 °C against the published 708 °C. A large share of the heat, about 42%, arrives through the relatively cool blanket-helium circuit. An independent reviewer found that the published circuit heat loads and temperatures cannot all hold under the paper's stated exchanger temperature differences, and our sources do not say how ARIES reached its temperature. The gap remains unresolved.
  • Cost: almost all of the difference is the tritium assumption. ARIES reported $77.6/MWh in 2004 dollars. For the 891 MW case our model gives $686/MWh, more than 90% of it tritium: the model cannot yet calculate ARIES's breeding, so it buys all its tritium at an assumed $30 million per kilogram. ARIES assumes the blanket breeds all the tritium the plant needs. Cost assessment work/orchestration/goals/aries-reconciled-alternative-economics/answer.md
    • With that assumption and ARIES's other accounting conventions, we calculate about $59/MWh at our assumed 5% real discount rate, and $32 to $105/MWh between 0 and 10%. Historical ARIES costing uses 4.35%, though other financial assumptions also differ, so the remaining difference is unresolved.
    • Much of our equipment cost came from ARIES's own accounts, so this is an accounting comparison, not an independent check of their estimate.
In the recordPower: from the first ARIES case to 891 MW

Each row supplies ARIES's 2,436 MW of fusion power. Only the last two model rows remove all the heat, so only they are steady operating points.

CaseHeat left unremoved, MWNet, MW
Our first ARIES case: assumed inputs, exchangers in series158.7796.0
Every source-supported input correction, still in series151.0842.7
Those corrections with ARIES's split exchanger network109.9879.7
Split network, recuperator effectiveness lowered to 0.80759.9
Split network, cycle flow 1,700 kg/s on a 1,700 MW compressor0891.0
ARIES, published01,000
  • The remaining 109 MW is in conversion efficiency: 0.391 against ARIES's 0.43. Auxiliary power and total heat agree within the comparison's tolerances. Our turbine inlet is 628 °C against 708 °C. The extra flow needed to accept all the heat lowers it, and the published data do not show how ARIES reached 708 °C.
  • The reviewer's finding. Taking the printed loads and temperatures together, the blanket-helium loop carries 42% of the heat over 21% of the temperature climb the cycle gas needs. With those values, none of the exchanger arrangements checked brings the cycle gas to 707 °C.
  • What the sources leave open. The cycle references ARIES cites take the turbine inlet temperature as a given input from a single heat source. The paper that might say how ARIES combined its three loops is closed access, and the owner deferred buying it.
  • Our per-branch exchangers are generous to ARIES. They run with 4 to 5 K between the streams, against the printed 30 °C, so imposing 30 K would widen the gap. The 891 MW case is the best tested steady case, not an upper bound or a reconstruction of ARIES.
In the recordCost: the difference by cause

Each of ARIES's conventions was substituted into our 891 MW case one at a time, as a labelled diagnostic, never as the prediction. Effects are on LCOE in 2004 dollars per MWh.

CauseEffect
Tritium: we buy all of it; ARIES prices none−627.3
Output: 891 MW against ARIES's 1,000 MW, on the aligned figure−6.5
Operation and maintenance at ARIES's share of cost+1.6
Plant life of 47 calendar years, ARIES's 40 full-power years−2.2
ARIES's replacement cadence, 13 blanket replacements+1.5
Capital scope: our overheads against ARIES's inclusive factor of 1.93+0.2
Real discount rate from 0 to 10%, all else aligned$32 to $105

Historical ARIES costing uses a 4.35% real discount rate. How ARIES-CS applied its financing is not recoverable from the printed pages, and neither are its decommissioning allowance, an independent operating cost or its treatment of tritium. Three costs of the 891 MW case are bounded rather than priced: the higher-effectiveness recuperator, the cycle-side allowances at the higher flow, and PbLi pumping.

3.4The answer to question 1

Not with the library as built, and only partly once we added what ARIES needed. We made the big changes: a hollow plasma density profile, a blanket with separate helium and PbLi circuits, a helium Brayton cycle, ARIES's split exchanger network, and ARIES's equipment and costs. They assembled with the existing components into an ARIES plant the model can run, and the Stellaris model was unchanged. The remaining differences matter. Our best tested steady case produces 891 MW net against ARIES's 1,000 MW, and we could not reconcile the published heat and temperature data with ARIES's 708 °C turbine inlet. Our cost comes near ARIES's only once we adopt its assumption that the blanket breeds its own tritium.

We then stopped, for time, before closing every gap. The ARIES magnets and conductor, breeding for the ARIES geometry and the cycle-temperature reconciliation remain open, and the financial comparison differs in more than the discount rate. Each is recorded with what it would take to close. And because we made the comparison after reading ARIES, it describes the differences rather than predicting them blind.

4Question 2: can the combined model explore designs neither plant covers?

With both plants' components in the library, the design space should be much larger than either plant, because a component from one can be combined with components from the other. Each study below changes one kind of design choice and asks a concrete engineering question about it. Each uses the plant that fits its question.

Study and questionWhat we changeWhat stays fixedHow we measure cost
Parameters: how far can lowering compressor pressure raise output?Two operating settings: compressor pressure ratio and cycle flowAll equipment in a hybrid plant: the Stellaris helium loop, delivering heat at 500 °C, feeding the ARIES Brayton cycleCost per MWh excluding fuel. With the equipment fixed, this cost moves only with electricity output.
Components: steam or helium Brayton conversion?The power-conversion system, with its exchangers and cooling equipmentA Stellaris-derived reactor at 2,500 or 2,800 MW of heatWhole-plant LCOE. The options buy different equipment and sell different amounts of electricity, so only the whole plant compares them.
Architecture: can different exchanger connections produce more electricity?How the cycle helium is routed through three exchangers: in series or splitAll equipment in the ARIES plant at 1,835 MW of fusion powerCost per MWh excluding fuel. With the equipment identical, this cost moves only with electricity output.

The fuel treatment follows from section 3.4. The parameters and architecture studies use the ARIES plant's cost accounts, where the model cannot yet calculate breeding and so buys all the tritium at an assumed price. That adds more than $800/MWh to every case and would bury the $6 to $42/MWh differences these studies measure, so we leave fuel out. The components study uses the Stellaris reactor, which calculates its own breeding, so its fuel cost is negligible and the whole-plant LCOE includes it. The ARIES accounts are in 2004 dollars and the Stellaris accounts in 2025 dollars, so costs should not be compared across studies or with section 3.3.

4.1Parameters: how far can lowering compressor pressure improve output?

We connected the Stellaris helium cooling loop to the ARIES helium Brayton cycle and varied two operating parameters: cycle flow and the pressure ratio of each compressor stage. The reactor heat and the selected equipment stayed fixed. How much electricity could these components produce together, and what would limit further improvement?

At a cycle flow of 2,500 kg/s, lowering the stage pressure ratio from the plant's starting value of 1.518 to about 1.427 raised net electricity from 427 to 621 MW, 45% more from the same equipment. Lowering it further to 1.425 left 7.8 MW of reactor heat unremoved. That setting cannot hold the plant's heat balance, even though the model still reports about 620 MW.

The gain comes mostly from the compressors. At 2,500 kg/s, lowering the ratio from 1.518 to 1.427 cut their work from 2,452 to 2,062 MW, while the turbine's output fell only from 3,132 to 2,941 MW, so the shaft work left for the generator rose from 680 to 879 MW. The recuperator also recovered more of the turbine's exhaust heat, 1,440 MW instead of 677, and the turbine inlet rose from 404 to 453 °C.

The reactor's helium loop needs its helium back from the exchanger at 562 K (289 °C), so that after its circulators it re-enters the blanket at its design 300 °C. Holding that return temperature is the second check the red point in Figure 6 fails: it sends the helium back half a kelvin too warm.

In Figure 6, the top panel is net electricity and the bottom panel is the reactor heat the exchanger leaves unremoved, both against the compressor pressure ratio. The dashed line marks the exchanger limit.

image/svg+xml 570 580 590 600 610 620 630 640 Net electricity (MW) 621 MW at the exchanger limit past the limit exchanger limit, ratio 1.4273 1.425 1.430 1.435 1.440 1.445 1.450 Pressure ratio per compressor stage (lower ratio ←) 0.0 2.5 5.0 7.5 10.0 Unremoved heat (MW) 7.8 MW of reactor heat cannot be removed
Figure 6The last part of that range, near the limit, with pressure ratio falling from right to left. Blue points pass every implemented check; the red point fails heat removal and the return-temperature requirement. Data: archive/write-up/aries-study-assets/parameter-figure-data.json.
In the recordThe seven stored cases in Figure 6

Each row is one stored case at a cycle flow of 2,500 kg/s. Bypass is the share of the loop flow routed around the exchanger to hold the return temperature. Cost excludes fuel, in 2004 dollars.

RatioNet, MWUnremoved heat, MWBypassHelium entering the exchanger, °CCost, $/MWhChecks
1.4500575.60.013.0%18598.63passes every check
1.4450585.80.010.7%18896.92passes every check
1.4400595.90.08.1%19195.28passes every check
1.4350605.80.05.2%19493.72passes every check
1.4300615.60.01.9%19792.23passes every check
1.4273620.80.00.0%19991.45passes every check
1.4250620.07.80.0%20091.57fails heat removal and return temperature

The limit comes from the connection between the power cycle and the exchanger. Lowering the pressure ratio changes the turbine and recuperator temperatures. The recuperator, which recovers turbine exhaust heat, then sends warmer gas toward the reactor heat exchanger. Eventually that gas is too warm for the exchanger to take all the reactor heat. A compressor setting is therefore limited by heat transfer elsewhere in the plant. The best setting is where the exchanger exactly matches its duty. At the starting ratio it had capacity to spare, so about a third of the loop flow had to bypass it to hold the return temperature.

Changing cycle flow moves that limit. More flow allows a lower ratio, but it does not always give more electricity, because compressor work and turbine inlet temperature change too.

Figure 7 repeats that search at seven cycle flows. The left panel is the pressure ratio at which the exchanger reaches its limit, and the right panel is the net electricity at that ratio.

image/svg+xml 2,000 2,250 2,500 2,750 3,000 3,250 3,500 Cycle helium flow (kg/s) 1.2 1.3 1.4 1.5 1.6 1.7 Pressure ratio at the exchanger limit 2,000 2,250 2,500 2,750 3,000 3,250 3,500 Cycle helium flow (kg/s) 520 540 560 580 600 620 640 620.8 617.9 Net electricity at that limit (MW)
Figure 7Each point is the limiting ratio at one flow. The best two, 2,500 and 2,750 kg/s, are within 3 MW of each other. Data: archive/write-up/aries-study-assets/parameter-figure-data.json.

Every cost except fuel is fixed in this sweep, so more electricity lowers the cost excluding fuel from $133 to $91.5/MWh in 2004 dollars. The output is low for the 3,300 MW of heat the loop delivers because the cycle runs cool: its turbine inlet is about 450 °C, against 708 °C in the ARIES design. The components study below shows the same effect on a different plant. These results use fixed machine efficiencies rather than vendor performance maps, and the bypass hardware is not modeled. The exchanger was fixed equipment in this sweep, so sizing it is the next step.

Evidence: final parameter-study assessment work/orchestration/goals/design-study-parameters/answer.md, verified case results exploration/costed_loop_brayton/studies/20260926-design-study-parameters-b/results/readout.md, figure data archive/write-up/aries-study-assets/parameter-figure-data.json and reproducible renderer archive/write-up/aries-study-assets/render_parameters.py.

In the recordThe plant, the best points and what the study does not claim
  • The plant. The Stellaris helium loop delivers 3,301 MW at 773 K (500 °C) through a 50,000 m² exchanger into the ARIES Brayton chain: three compressor stages with intercooling, a recuperator of 0.8 effectiveness and one turbine.
  • The starting point. 2,500 kg/s at a stage ratio of 1.518 nets 426.6 MW, with 31% of the loop flow bypassing the exchanger.
  • The best tested points. At 2,500 kg/s and a ratio of 1.4273 the plant nets 620.8 MW with no bypass. At 2,750 kg/s and 1.3629 it nets 617.9 MW, inside the study's 5 MW materiality, so the two flows form one best band.
  • The next limit. A 75,000 m² exchanger, $29 million more, reaches 671.6 MW at 2,500 kg/s and a ratio of 1.40 with a 3.9% bypass. Beyond that, the compressor rating limits.

The study does not claim an upper bound on output, a single best flow, an operating recommendation or a bypass limit. It has no off-design machine maps and no control analysis of the bypass. Its 22 cases are sealed with the study record.

4.2Components: steam or helium Brayton conversion?

How do the tested steam and helium Brayton options compare on a reactor that supplies helium at a fixed 500 °C? At that temperature steam works well and a Brayton turbine needs a hotter source, so this comparison favors steam. We built steam and helium Brayton alternatives from the expanded library, with their connecting exchangers and cooling equipment, and attached each to the same Stellaris-derived reactor. For each, we calculated the whole plant: electricity exported after internal use, capital, fuel, operation and equipment replacement.

At this 500 °C source, steam gave the lower LCOE at both supported heat loads, because it exported more than twice as much electricity.

Reactor heat suppliedSteam net exportSteam LCOEBrayton net exportBrayton LCOE
2,500 MW664 MW$408/MWh286 MW$875/MWh
2,800 MW747 MW$371/MWh204 MW$1,230/MWh

Costs are in 2025 dollars, at 80% availability over 30 years and a 5% real discount rate. Equipment was selected separately at each heat load from a fixed list of priced options, so the rows are different selections, not one plant at rising heat. At 3,000 MW the selected cooling and divertor hardware failed their checks, so neither option gave a supported plant.

The two options also had different freedoms within that list: the steam turbine was held at its supported temperatures, while the Brayton cycle's flow and pressure ratio could vary. So neither was optimized on equal terms, and the result does not rank the two technologies in general.

The difference starts with temperature. A gas cycle spends much of its turbine's work driving its compressors, and that share grows as the turbine inlet gets cooler. From 500 °C helium, the Brayton turbine inlet was about 413 °C, against about 708 °C in the ARIES design, and the compressors took about 1,900 MW of the turbine's 2,478 MW. At 2,500 MW, Brayton delivered 559 MW after its conversion equipment's own use, against 938 MW for steam. Both plants then spent another 274 MW on reactor circulation, heating, refrigeration and other services, leaving 664 MW and 286 MW to sell. That 274 MW includes 100 MW of electricity for plasma heating, which we supplied as an assumption. A burning plasma may not need it.

In Figure 8, each bar is one plant. Its full length is the electricity the plant generates, and the blue part is what remains for sale after the plant's own use.

image/svg+xml 0 200 400 600 800 1,000 1,200 Electricity (MW) 2,500 MW · steam 2,500 MW · gas 2,800 MW · steam 2,800 MW · gas 664 for sale 274 960 generated 286 for sale 274 567 generated 747 for sale 314 1,086 generated 204 for sale 314 525 generated For sale Conversion equipment's own use Reactor circulation, heating, refrigeration and services
Figure 8Blue is electricity available for sale; orange and green show internal consumption. "Gas" denotes helium Brayton, with its compressor work already subtracted. Data: exploration/whole_plant_conversion/studies/20260927-design-study-whole-plant-conversion-b/results/presentation/matched-account-table.csv.

Steam's conversion equipment cost $2.55 billion, against $1.54 billion for Brayton. Per kilowatt the two cost about the same: about $2,720 for steam and $2,750 for Brayton, dividing each by its conversion subsystem's net output of 938 and 559 MW. An earlier version of this study, which costed the conversion equipment alone, likewise found the two within $5/MWh of each other. Both plants also needed the same $10.23 billion of other purchases, and steam spread those common costs, and later reactor replacements, over more than twice as many MWh. So the LCOE gap comes from Brayton's lower output at this source temperature, not from its equipment price.

In Figure 9, each bar is one plant's LCOE, split by where the money goes; the first segment is the capital to build the plant.

image/svg+xml 0 200 400 600 800 1,000 1,200 1,400 Whole-plant LCOE (2025 $ per MWh) 2,500 MW · steam 2,500 MW · gas 2,800 MW · steam 2,800 MW · gas $313 $408 per MWh $669 $875 per MWh $283 $371 per MWh $936 $1,230 per MWh Initial financed capital Annual service, fuel, makeup and imports Blanket, magnet, primary and conversion replacements Overhaul and terminal cost
Figure 9Capital and replacement costs dominate. A similar reactor expense becomes a much larger cost per MWh when the plant exports less electricity. Data: exploration/whole_plant_conversion/studies/20260927-design-study-whole-plant-conversion-b/results/presentation/matched-account-table.csv.

What would change the result at this 500 °C source? Steam stayed cheaper under every tested change in prices, reactor cost and operating assumptions taken one at a time. Only a combination reversed it, at 2,800 MW: Brayton machine efficiencies three points higher, steam turbine efficiencies three points lower, Brayton equipment at half price and steam equipment 50% dearer. Brayton then cost $397/MWh against steam's $427/MWh, an assumed scenario rather than a vendor offer. The next study is to design each cycle for its own source temperature and to settle the heating assumption. Sensitivity results exploration/whole_plant_conversion/studies/20260927-design-study-whole-plant-conversion-b/results/presentation/preference-sensitivity.svg

In the recordEvery tested change, at both heat loads

Each row of Figure 10 is a group of tested changes, and each dot is one tested case, placed at Brayton's LCOE divided by steam's. The black diamond is the nominal case. Four tested changes left neither option supported and are not plotted: 90% availability, 13 kW of extra cold load, 40% heating efficiency and 80 W/m³ of nuclear heating.

image/svg+xml 1× 2× 4× 8× Combined efficiencies and quotes Combined machine efficiencies Cryogenic and nuclear heating loads Heating, pumping and other loads Import electricity price Routine service allocation Auxiliary heat-rejection quote Conversion quotes and service costs Magnet life 8 or 12 years Primary piping quote ×0.5 or ×1.5 Reactor installation cost Contingency and overhead rates Common plant quotes ×0.5 or ×1.5 Availability 65% Discount rate 0 or 10% Breeding ratio and tritium price Nominal assumptions 2,500 MW of reactor heat 1× 2× 4× 8× Brayton $397, steam $427 2,800 MW of reactor heat Brayton's LCOE as a multiple of steam's, on a log scale. Right of 1×, steam is cheaper; in the shaded band, Brayton is.
Figure 10Brayton's LCOE over steam's for every supported tested case. Data: exploration/whole_plant_conversion/studies/20260927-design-study-whole-plant-conversion-b/results/presentation/native-ranking.csv.

Holding the gas-favourable efficiencies at 2,800 MW and moving the two quotes in opposite directions, the costs are equal near a 28% Brayton discount and steam premium. Brayton is materially cheaper, by more than the study's $5/MWh reporting band, from about 32%.

Evidence: study results and assumptions work/orchestration/goals/design-study-whole-plant-conversion/answer.md (2,496 cases, each recalculated by an independent check), earlier conversion-only comparison work/orchestration/goals/design-study-component-alternatives/answer.md.

In the recordThe reactor, the assumptions and the earlier comparison
  • The reactor held fixed: a Stellaris-derived stellarator with a 12.7 m major radius, 1.3 m minor radius and 48 coils, and 14 primary helium paths at 8 MPa rising from 300 to 500 °C. Its 50 MW of deposited heating, drawing 100 MW of electricity, is a supplied assumption. It is not established that a burning plasma needs it.
  • Why Brayton exports less at 2,800 MW than at 2,500 MW: the Brayton offer selected at 2,500 MW fails the reactor-interface check at 2,800 MW, so the list selects a different operating offer there.
  • Verification: every one of the 2,496 cases passes an independent recalculation of 1,192 channels and 125 check verdicts, including cases that fail engineering checks. Passing verification does not make those cases feasible.

The earlier conversion-only comparison costed the conversion equipment alone, per net MWh in 2025 dollars at 85% availability:

Reactor heatSteam, $/MWhBrayton, $/MWh
2,500 MW33.7633.77
2,800 MW32.4136.47

Both differences lie within that study's $5/MWh reporting band. It left out the common reactor plant, which both options share, so it could not see how output spreads those common costs.

4.3Architecture: can different exchanger connections produce more electricity?

We kept the reactor heat and selected equipment the same, then changed how the power-cycle helium passes through three heat exchangers. In series, the whole stream visits each exchanger in turn. In the split network, it passes through the blanket-helium exchanger first, divides between the PbLi and divertor exchangers, then mixes before the turbine. The split network is the arrangement ARIES uses; our first ARIES model had used series (section 3.3).

In Figure 11, follow the cycle helium from left to right, from the recuperator to the turbine. The top row is the series layout and the bottom row is the split network. Each box gives the helium's temperature entering and leaving it at the nominal operating pair compared below; watch the temperature at which the helium reaches the PbLi exchanger.

Series
Recuperator outlet235 °C
Blanket-helium exchanger235 → 369 °C
Divertor exchanger369 → 414 °C
PbLi exchanger414 → 569 °C
Turbineinlet 569 °C
Split network
Recuperator outlet248 °C
Blanket-helium exchanger248 → 386 °C
PbLi exchanger386 → 603 °C
Divertor exchanger386 → 568 °C
Turbineinlet 594 °C

Temperatures are the cycle helium entering and leaving each exchanger at the nominal operating pair. The PbLi exchanger receives the stream at 414 °C in series, after the divertor exchanger has warmed it, and at 386 °C in the split network. Each exchanger takes its heat from its own primary stream: blanket helium, PbLi or divertor helium.

Figure 11Both arrangements use the same exchangers and machinery. Cycle flow is adjustable in both; the network also chooses its split between branches. Redrawn from work/orchestration/goals/design-study-exchanger-architecture/evidence/figures/r3-connections.png; temperatures from cases 216 (series) and 254 (network) in work/orchestration/goals/design-study-exchanger-architecture/evidence/r3-data/thermal.csv and work/orchestration/goals/design-study-exchanger-architecture/evidence/r3-data/cases.csv.

At 1,835 MW of fusion power, the best tested network operation produced 528 MW net against 498 MW for series, about 31 MW or 6.2% more. Both removed all the reactor heat, met the required return temperatures, and kept at least 30 K between the streams at both ends of every primary exchanger. ARIES cites 30 K for its exchanger bank as a whole; applying it to each exchanger is our assumption, and meeting it required a revised exchanger selection for both layouts.

Both layouts depend on a large bypass. To hold the reactor loops' return temperatures, roughly two-thirds of the blanket helium bypasses its exchanger: 63% in the network and 69% in series. With every bypass limited to 50%, no tested operation of either layout passed. The valves and their costs and pressure losses are not modeled, so the comparison holds only under that control assumption.

Figure 12 compares the two layouts at that operating point: cycle flow, then net electricity, then cost excluding fuel.

image/svg+xml 0 500 1,000 1,500 Series Split 1,291 1,246 Cycle helium flow (kg/s) 0 200 400 600 497.8 528.4 Net electricity (MW) 0 50 100 $104.29 $98.24 Cost excluding fuel (2004 $/MWh)
Figure 12Both layouts use the same revised exchangers: 18,000 m² each for blanket helium and PbLi, and 2,000 m² for the divertor. Cost excludes recurring fuel purchases; the bypass and any extra piping and controls are not priced. Data: archive/write-up/aries-study-assets/architecture-figure-data.json.

The split lets the cycle take the same heat with less circulating helium. In series, the divertor exchanger warms the entire stream before it reaches the PbLi exchanger. Splitting avoids that preheating, so the network needs about 1,246 kg/s of cycle flow where series needs 1,291 kg/s. Less flow means less compressor work and more electricity to export. At equal flow, when both remove all the heat, they produce exactly the same electricity: the split gives no separate efficiency bonus. With costs unchanged, the extra electricity lowers the cost excluding fuel from $104.29 to $98.24/MWh in 2004 dollars.

The study also shows what would reverse the choice. If the network loses 8% of the cycle pressure against 4.5% for series, its output falls to 491 MW, below series at 498 MW. The model does not calculate this loss from the piping. Each layout's loss is a supplied fraction, 4.5% in the nominal case, so calculating it is the next step. The network's real pressure losses and its extra piping and controls therefore decide whether it is worth building.

Changing connections can cut the circulation needed to carry the reactor heat, and so raise output, but added pressure loss can erase the gain. The study gives the gain and the supplied loss that would erase it: a reason to prefer the network, and a concrete thing to calculate before choosing it.

Evidence: final architecture assessment and replay work/orchestration/goals/design-study-exchanger-architecture/answer.md, verified sensitivities work/orchestration/goals/design-study-exchanger-architecture/evidence/r3-data/sensitivity-coverage.csv, figure data archive/write-up/aries-study-assets/architecture-figure-data.json and renderer archive/write-up/aries-study-assets/render_architecture.py.

In the recordWhat changes the preference

Each change was tested on the nominal pair at 1,835 MW, with the cycle flow and split chosen again for each layout. The gain is the network's net electricity over series.

Tested changeResult
Exchanger heat-transfer coefficient 20% lowerThe network still gains 19.4 MW.
Heat-transfer coefficient 20% higherThe network passes; no sampled series operation does.
Cycle pressure loss of 2% or 8% in both layoutsGains of 29.9 and 31.8 MW.
Pressure loss of 8% in the network against 4.5% in seriesReversed: network 491.2 MW against series 497.8 MW, and its cost $12.76/MWh higher.
Pump power 20% lower or higherGains of 30.1 and 31.3 MW.
At least 45 K at every exchanger terminalNo sampled operation passes, in either layout.
Every primary bypass limited to 25% or 50%No sampled operation passes, in either layout.

How much the network can afford. At a zero tritium price, the network keeps its price advantage while carrying up to $21.9 million a year of extra annualized cost in 2004 dollars, or up to 30.7 MW of extra electrical demand, but not both at once. These are affordability limits, not estimates of the piping and controls.

In series, 52.9% of the divertor flow also bypasses its exchanger; in the network, almost none does. All 1,277 native cases passed independent verification, and 535 of them pass every engineering check.

4.4The answer to question 2

Yes, within the physics and prices we represent. Each study evaluated a design question across the whole plant and showed what limits the result:

  • Parameters: an exchanger elsewhere in the plant limits the compressor setting, and the best setting raised output 45% with the same equipment.
  • Components: the conversion system can be swapped with its own equipment and evaluated as a whole plant. On a fixed 500 °C source, which favors steam, steam exported more than twice as much electricity and so gave the lower LCOE. This does not rank the technologies in general.
  • Architecture: splitting the exchanger flow gains 6%, but a few percent more pressure loss erases the gain.

Two of the studies combine components from both plants, which neither original model could do. The results are conditional on the represented physics and assumed prices, and each says where the design is limited and what to check before choosing it.

5What the test showed and where to go next

Across both supports, two things seem to be working:

  • The harness. Over the 28 goals in Part 4a, the model grew from 55 calculations, 6 checks and 14 parts to 199, 67 and 76, and most of that growth came in the last eight goals. Goals also seemed to finish faster as we refined the harness.
  • The modeling framework. With two design points, it held up and produced studies. ARIES assembled from the same library once we added what it needed, the Stellaris model stayed unchanged, and the combined library ran the three studies in section 4. Much of the component library did not carry over: ARIES needed new plasma, blanket, conversion and cost definitions, and still lacks its own magnet and conductor models.

The studies are imperfect. Reviewers found mistakes in our assumptions and in how we read the results, and many of the issues we caught came from comparing the model with a published design. Whether the harness's own checks are enough where there is no published design to compare against is still open.

Even so, we would love to see this get pushed further:

  • Across design sets. Stellaris and ARIES are both stellarators. More diverse designs would show how far the library carries.
  • In detail. Every result here depends on detail we left out or assumed, such as the ARIES magnets and breeding, and the machines' off-design performance.
  • Toward more interesting knowledge transfer. For example, AI could reconcile data across sources and build strong component models from first principles where the primary source papers don't have the detail.

With this further push, we may find a way for AI to extend what engineers can do in highly technical concept design, in fusion and beyond.